Reconciliation Of Nickel Laterite Mining In Block M PT. Bumi Konawe Abadi Motui Village, Motui District, North Konawe Regency, Southeast Sulawesi Province
Keywords:
Reconciliation, Mining Recovery, Mining SequenceAbstract
This study aims to evaluate the suitability between the plan and the realization of nickel laterite mining in Block M PT. Bumi Konawe Abadi, Motui Village, Motui District, North Konawe Regency, Southeast Sulawesi Province. Data were collected through direct surveys using UAV (Unmanned Aerial Vehicle) to obtain aerial imagery, as well as software such as Surpac, ArcGIS, and Microsoft Excel for data processing and analysis. The results of the study showed a discrepancy between the plan and the realization of mining in each month. In October, the actual realization of overburden was 332,967.01 tons, exceeding the plan of 243,597.00 tons, and the actual realization of ore was 237,599.00 tons exceeding the plan of 196,070.26 tons. However, in November, the actual realization of overburden of 281,344.00 tons was slightly below the plan of 292,810.00 tons, and the actual realization of ore only reached 87,187.00 tons from the plan of 202,620.46 tons. December showed a decline with the actual reaction of overburden of 274,833.00 tons from the plan of 353,762.00 tons, and the actual realization of ore of 118,665.60 tons from the target of 253,044.53 tons. The main factors causing the discrepancy include the lack of operational supervision, changes in field conditions, and limitations in technical implementation. The mining recovery value is calculated to measure the level of achievement of the plan, and drone imagery accuracy tests are carried out to ensure the validity of spatial data.
References
G. Mongelli, B. Taghipour, R. Sinisi, and S. Khadivar, “Mineralization and element redistribution in the Chah-Gheib Ni-laterite ore,” Ore Geol. Rev., vol. 111, no. October 2018, p. 102990, 2019, doi: 10.1016/j.oregeorev.2019.102990.
A. Kurniadi, mega fatima Rosma, euis tintin Yuningsih, and luhur pambudi H., “Karakteristik Batuan Asal Pembentukan Endapan Nikel Laterit Di Daerah Madang dan Serakaman Tengah,” Padjadjaran Geosci. J., vol. 02, no. 03, pp. 221–234, 2018.
R. Safrudin and dan Wawan Ak Conoras, “Estimasi Sumberdaya Nikel Laterit Dengan Metode Geostatistik Ordinari Kriging Pada Pt. Dharma Rosadi Internasional Kabupaten Halmahera Tengah Provinsi Maluku Utara,” J. GEOMining Tek. Pertamb. Unkhair, vol. 2, no. 1, pp. 38–48, 2021.
R. Indonesia, Keputusan Menteri Energi dan Sumber Daya Mineral Republik Indonesia Nomor 1827 K/30/MEM/2018 Tentang Pedoman Pelaksanaan Kaidah Pertambangan Yang Baik. Republik Indonesia, 2018.
A. Syauqani, S. Suwiyannto, and A. Suprayogi, “Pengaruh Variasi Tinggi Terbang Menggunakan Wahana Unmanned Aerial Vehicle (UAV) Quadcopter Dji Phantom 3 Pro Pada Pembuatan Peta Orthofoto (Studi Kasus Kampus Universitas Diponegoro),” J. Geod. Undip, vol. 6, no. 1, pp. 249–257, 2017, [Online]. Available: http://ijict.iaescore.com/index.php/IJICT/article/view/1083
S. Kurniawan and M. N. Cahyadi, “Utilization of Unmanned Aerial Vehicle (Uav) for Measurement of Surface Coal Mining Situation,” J. Mar. Sci. Technol., vol. 3, no. 2, pp. 29–34, 2023, doi: 10.12962/j27745449.v3i2.576.
A. Renata, M. U. Dwiatmoko, and M. Z. Arief, “Kajian akurasi drone menggunakan ground control point pada Seam C Pit Cendana Selatan PT Hasnur Riung Sinergi,” J. Himasapta, vol. 8, no. 2, p. 113, 2023, doi: 10.20527/jhs.v8i2.9609.
P. S. Panjaitan and J. M. Supit, “Kajian Tingkat Akurasi dan Ketelitian Geometri Peta Dasar dari Hasil Pengolahan Data Foto Udara untuk Pemanfaatannya di Sektor Pertambangan,” INTAN J. Penelit. Tambang, vol. 4, no. 2, pp. 121–125, 2021.
R. Indonesia, Peraturan Kepala Badan Informasi Geospasial Nomor 15 Tahun 2014 Tentang Pedoman Teknis Ketelitian Peta Dasar. 2014.
Downloads
Published
Issue
Section
License
Copyright (c) 2025 Ichwal Ramadhan, Deniyatno Deniyatno, Irfan Saputra, Tri Utomo Taliding

This work is licensed under a Creative Commons Attribution 4.0 International License.