Optimalisasi Pit Anggrek Blok IUP 199 Ha PT. Ang and Fang Brother Kabupaten Morowali Provinsi Sulawesi Tengah

OPTIMIZATION OF PIT ANGGREK BLOCK IUP 199 Ha PT. ANG AND FANG BROTHER MOROWALI COUNTY CENTRAL SULAWESI

Authors

  • Madu Arum Universitas Halu Oleo
  • Deniyatno Deniyatno Universitas Halu Oleo
  • Marwan Zam Mili Halu Oleo University
  • Abdul Hadid Ulfa Halu Oleo University

Keywords:

PIT Optimization, Lerch Grissman, Reserve, Resource, nickel

Abstract

The optimization of a pit to be mined, this is useful for reducing costs and avoiding taking too much waste. Pit optimization has become an important part that must be done when experiencing difficulties so as to help identify the most optimal resources or reserves. Pit limit optimization is processed using the Learchs-Grossman method. The results showed that the calculation of reserves according to the optimization of Learch Grossman obtained ore tonnage of 487,687 tons with a content of 1.71% and a stripping ratio value of 1.37: 1. The making of the pit level is carried out by paying attention to the safety factor value (FK) of 1.9 resulting in a pit opening area of 5.9 ha. Based on these parameters, the amount of reserves in the pit limit optimization according to the Lerch Grossman algorithm was 487,687 tons of ore and waste of 668,560 tons.

References

P. Prasetyo, “Sumber Daya Mineral Di Indonesia Khususnya Bijih Nikel Laterit dan Masalah Pengolahannya Sehubungan Dengan UU Minerba 2009,” Semin. Nas. Sains dan Teknol. 2016, vol. 8, no. November, p. 1, 2016.

R. Prayogo, “Rancangan Penambangan di Pit Ferrari Pinang Balaba 12 PT. Vale Indonesia,Tbk Desa Sorowako Kecamatan Nuha Kabupaten Luwu Timur Provinsi Sulawesi Selatan,” Prosiding, Semin. Teknol. Kebumian dan Kelaut. (SEMITAN II), vol. 2, no. 1, p. 668, 2020.

F. Rahmi and D. Yulhendra, “Optimalisasi Pit Limit Penambangan Mineral Nikel Laterit PT ANTAM Tbk . Unit Bisnis Penambangan Nikel Di Site Pomalaa Sulawesi Tenggara Di Front X,” J. Bina Tambang, vol. 4, no. 3, pp. 294–305, 2019.

Supandi, “Prediksi Umur Dinding Tambang Berdasarkan Kejadian Longsoran yang Pernah Terjadi dengan Bantuan Program Microsoft Access,” Semin. Nas. Inform. 2013, pp. 244–245, 2013.

D. A. Purwaningsih and Mamas, “Rancangan Teknis Desain Push Back pada Penambangan Batubara Pit 10 dan Pit 13 PT. Kayan Putra Utama Coal Kabupaten Kutai Kartanegara Kalimantan Timur,” JGP (Jurnal Geol. Pertambangan), vol. 1, no. 21, pp. 16–17, 2017.

W. Hustrulid, M. Kuchta, and R. Martin., OPEN PIT MINE PLANNING & DESIGN VOLUME 1-FUNDAMENTALS, 3rd ed. Colorado USA: CRC Press, 2013.