Abstract

Potential of Southeast Sulawesi Province for  nickel Pertambangan Bumi Indonesia Inc. Mining as a company operating in the nickel mining sector also took this opportunity and took the initiative to carry out a nickel mining business. PT. Indonesian Bumi Mining has a Mining Business Permit (IUP) area of ​​5.923 Ha. The MGE block has an area of ​​17 Ha and based on the Stripping ratio study at PT. Indonesian Earth Mining is 3:1 and Cut Off Grade Ni ≥ 1,3 %. To maximize mining activities in meeting production targets, a pit limit design is carried out, the amount of mineable reserves is based on the pit limit and mining age, and a Sequence design is carried out. In this research, the number of resources obtained has a volume of 1.296,00 m3 and has mined reserves of 527.937,75 tons with a geometric depth of 90% so that the ore tonnage value obtained is 586,597.50 tons. The average Ni content is 1,52% and the resulting stripping ratio value is 2,89 : 1, so the mine life in Pit 3 is estimated to be 5 months. Based on production targets, the Sequence is designed with 5 mining stages (mining Sequence) with different average Ni content values ​​for each Sequence, where the average Ni content in Sequence 1 is 1,52%, the average Ni content in Sequence 2, namely 1,40%, the average Ni content in Sequence 3 is 1,53%, the average Ni content in Sequence 4 is 1,57% and the average Ni content in Sequence 5 is 1,58%.

References

Aprianti, E., Pujiastuti, H., Isfanari, I., dan Rahmawati, E. (2021). Faktor Keamanan Lereng Jalan Raya Pusuk Kecamatan Pemenang Kabupaten Lombok Utara Menggunakan Metode Fellenius Dan Bishop. Spektrum Sipil, 8(1), 55–62.

Araya, A. S., Nehring, M., Vega, E. T., dan Miranda, N. S. (2020). The impact of equipment productivity and pushback width on the mine planning process. Journal of the Southern African Institute of Mining and Metallurgy, 120(10), 599–607.

Bai, X., Marcotte, D., Gamache, M., Gregory, D., dan Lapworth, A. (2018). Automatic generation of feasible mining pushbacks for open pit strategic planning. Journal of the Southern African Institute of Mining and Metallurgy, 118(5), 515–530.

Bargawa, W. S. (2018). Perencanaan Tambang

Area Mitsubishi PT. Pama Persada Nusantara (Edisi Kedelapan). Kllau Book.Yogyakarta. ISBN: 978-623-7594-31-4..

]Bullock, R. L., dan Mernitz, S. (2018). Mineral Property Evaluation: Handbook for Feasibility Studies and Due Diligence.

Drielsma, J. A., Russell-Vaccari, A. J., Drnek, T., Brady, T., Weihed, P., Mistry, M., dan Simbor, L. P. (2016). Mineral resources in life cycle impact assessment—defining the path forward. International Journal of Life Cycle Assessment, 21(1), 85–105.

Ersyad, F., Yulhendra, D., dan Prabowo, H. (2017). Technical and Economical Study on Design Progress of Limestone Quarry Mining in April-August 2017 at Front III B-IV B Bukit Karang Putih PT. Semen Padang. Bina Tambang, 3(3), 1185–1201.

Gadang, B., Village, U., Sub-district, L. K., Husaini, A. F., Guntoro, M. D., & Karang, I. U. P. (2018). Penjadwalan Produksi dan Pentahapan Tambang ( Mine Sequence ) Kuari Batu Gamping pada Iup Op 412 Ha di PT Semen Padang , Kelurahan Batu Gadang , Kecamatan Lubuk Kilangan , Kotamadya Padang , Provinsi Sumatera Barat Mine Scheduling and Mine Sequence of Limestone Quarry In Iup 412 Ha at PT Semen PT Semen Padang , Sumberdaya Terukur Batu Gamping pada Bukit Tajarang IUP 412 Ha yaitu sebesar Landasan Teori Batu Gamping merupakan bagian dari batuan sedimen , yaitu Kandungan utama Batu Gamping adalah mineral kalsium karbonat mineral yang terkandung dalam kalsit sebesar 95 %, dolomit sebanyak Sumberdaya dan Cadangan Sumberdaya mineral adalah suatu konsentrasi atau keterjadian dari.

Hustrulid, W., Kuchta, M., dan Martin, R. (2013). Open Pit Mine Planning & Design 3rd Edition.

Indrajaya, F., Natallia, A. L., dan Sukmawatie, N. (2020). Perancangan Sequence Penambangan Batubara pada PT XYZ Provinsi Sumatera Selatan. Jurnal Geomine, 7(3), 240.

Kurniadi, Adi. Rosana, Mega Fatimah. Yuningsih Euis Tintin. Luhur, P. H. (2018). Karakteristik Batuan Asal Pembentukan Endapan Nikel Laterit Di Daerah Madang dan Serakaman Tengah. Padjadjaran Geoscience Journal, 02(03), 221–234.

Lintjewas, L., Setiawan, I., dan Kausar, A. Al. (2019). Profil Endapan Nikel Laterit di Daerah Palangga, Provinsi Sulawesi Tenggara. RISET Geologi Dan Pertambangan, 29(1), 91.

Pangemanan, V. G. M., Turangan, A. E., dan Sompie, O. B. A. (2014). Analisis Kestabilan Lereng Dengan Metode Fellenius. Jurnal Sipil Statik, 2(1), 37–46.

Prasetyono, E. N. H., Kusdarini, E., dan Cahyono, Y. D. G. (2020). Rancangan Pit Penambangan Batubara Pada Pit X Pt. Prolindo Cipta Nusantara, Site Sie Loban, Kabupaten Tanah Bumbu, Provinsi Kalimantan Selatan. Prosiding Seminar Teknologi Kebumian Dan Kelautan, 2(1), 71–78.

Prinandi, A. R. (2015). Perancangan (Design) Pit Ef pada Penambangan Batubara di PT. Milagro Indonesia Mining Desa Sungai Merdeka, Kecamatan Samboja, Kabupaten Kutai Kartanegara, Provinsi Kalimantan Timur. Prosiding Teknik Pertambangan, 102–103.

Putra, WaskitRijal, W., Mingsi Anaperta, Y., Pertambangan, J. T., Teknik, F., Padang, U. N., & Id, Y. C. (2020). Evaluasi Pengaruh Geometri Jalan Angkut Batukapur Terhadap Produksi Di Area 242 Bukit Tajarang Pt. Semen Padang. Jurnal Bina Tambang, 5(1), 143–152.

Rinawan, F. I., Nugroho, H., dan Wibawa, R. R. (2014). Pemodelan Tiga Dimensi (3D) Potensi Laterit Nikel Studi Kasus: Pulau Pakal, Halmahera Timur, Maluku Utara. Itenas Rekayasa, 18(1), 56–65.

Saleki, M., Kakaie, R., dan Ataei, M. (2019). Mathematical relationship between ultimate pit limits generated by discounted and undiscounted block value maximization in open pit mining. Journal of Sustainable Mining, 18(2), 94–99.

Tinambunan, D., Fahraini, F., dan Irvani. (2018). Analisa Kestabilan Lereng Menggunakan Metode Fellenius Secara Manual dan Software Slide Rocscience 6.0 (Studi Kasus : TB 1.42 Pemali PT Timah (Persero) Tbk) (Analysis Slope Stability Using Fellenius Method Manually And Software Slide Rocscience 6.0 in TB 1.42 Pemali PT Timah (Persero) Tbk). Jurnal Mineral, 3(1), 39–48.

Tinambunan, D., Fahraini, F., dan Irvani. (2018). Analisa Kestabilan Lereng Menggunakan Metode Fellenius Secara Manual dan Software Slide Rocscience 6.0 (Studi Kasus : TB 1.42 Pemali PT Timah (Persero) Tbk) (Analysis Slope Stability Using Fellenius Method Manually And Software Slide Rocscience 6.0 in TB 1.42 Pemali PT Timah (Persero) Tbk). Jurnal Mineral, 3(1), 39–48.

Zainassolihin, A. ahmad. (2003). material dalam pit telah dilakukan, maka dapat dilakukan perhitungan terhadap cadangan bijih (tonase dan grade) yang dapat dieksploitasi secara ekonomis. Sehingga, dengan rencana target produksi yang telah ditetapkan, maka lamanya umur tambang dapat dihit. 15–48