PLANNING OF RECLAMATION COSTS FOR NICKEL ORE MINING LAND IN BLOCK B PT ARGA MORINI INDAH, TALAGA RAYA DISTRICT, CENTRAL BUTON REGENCY

Authors

  • Ingky Wijoyo
  • Deniyatno Deniyatno Halu Oleo University
  • Marwan Zam Mili Halu Oleo University
  • Laode Jonas Tugo Halu Oleo University

Keywords:

Reclamation, Land Use, Revegetation, Reclamation Costs

Abstract

The reclamation activity itself is the restoration of former mining land to repair land that is ecologically disturbed. PT. Arga Morini Indah is one of the companies that took the opportunity to carry out a nickel ore mining business with a Mining Business Permit (IUP) area of 2,834.96 Ha. PT. Arga Morini Indah is currently conducting active mining activities, from production through to shipping. These activities have caused several blocks, including Block B, to reach the mine-out stage. To manage environmental impacts, reclamation cost planning is required before reclamation activities are undertaken. This study aims to estimate the cost of reclamation on post-mining land with the area of reclaimed land in spot 1 of ±0,53 Ha, spot 2 ±1,5 Ha, spot 3 ±0,41 Ha, spot 4 ±0,73 Ha and spot 5 ±0,75 Ha, so that the total area of reclaimed land is 3,92 Ha. The total reclamation cost can be obtained based on the area of land to be reclaimed, the working time of the equipment at the time of land planning, workers' wages, and revegetation and maintenance costs. The plants used in the revegetation process were determined based on the results of the analysis of top soil samples and based on the selection of plant types from previous reclamation activities, namely mahogany, trembesi, acacia, sengon, and lamtoro plants for plants from outside, acid plants, guava, cypress, ironwood, wonu and ketapang for local plants, as well as Mucuna Bracteata (MB) plants as cover crop. The total cost of reclamation in Block B is Rp. 2.579.695.367 which is carried out for 61 days and continued with the maintenance process for 283 days, continuous fertilization for 48 days and weed control for 48 days.

 

References

Anafiati, A. I. 2021. Reklamasi Tahap Operasi Pada Tambang Batugamping UP. Parno Di Karangasem, Ponjong, Gunungkidul, D.I. Yogyakarta. Jurnal Rekayasa Lingkungan, Vol. 21, No. 2, Hal. 43-44, ISSN: 2716-4470.

Bargawa, W. S., 2018. Perencanaan Tambang. Edisi Kedelapan.Yogyakarta. Kilau Book. Hal. 197-205, ISBN: 978-623-7594-31-4.

Bargawa, W. S., 2017. Reklamasi dan Pascatambang. Edisi Ketiga.Yogyakarta. Kilau Book. Hal. 371-381, ISBN: 978-623-7594-53-2.

Haryadi, D., Darwance, Salfutra, D. R. 2018. Antara Ekspektasi Dan Implementasi (Studi Problematika Reklamasi Pertambangan Timah Di Pulau Belitung). Edisi Pertama. Yogyakarta. Istana Media. Hal. 24, 26-28, dan 31-34, ISBN: 978-602-0763-15-6.

Heriansyah, I., Siregar, A. C., Mansur, I., Manege, E., Kadyonggo, E., Wijianto, A., Suprapto, T. 2019. Petunjuk Teknis Reklamasi Pasca Tambang Pada Kawasan Hutan. Jakarta. Pusat Keteknikan Kehutanan dan Lingkungan Kementerian Lingkungan Hidup dan Kehutanan. Hal. 8-10.

Kholil, A. (2012). Alat berat. Remaja Rosdakarya. Bandung. ISBN: 978-979692-080-8.

Komatsu, 2007, Specification and Application Handbook Edition 28, Komatsu Ltd,Tokyo.

Komatsu. (2019). Application Handbook Edition 32. Section 15A. Printed in Japan.

Mahfud, Rosmawati, dan Nurdin. 2022. Corporate Responsibility For Environmental Protection And Management In Ex-Mining Land. Syiah Kuala Law Journal, Vol. 6, No. 1, Hal. 115, ISSN: 2580-9059.

Nirmala, A., Inabuy, L. S., dan Meilasari, F. 2019. Rencana Teknis Kegiatan Reklamasi Pada Tambang Batu Granit PT. Gilgal Batu Alam Lestari Kecamatan Sungai Kunyit Kabupaten Mempawah Kalimantan Barat. Jurnal Bina Tambang, Hal. 2, ISSN: 2102-3134.

Pevria, R., Nurilah, dan Wulandari, R. 2022. Analisis Issue-Issue Dalam Etika Lingkungan (Reklamasi Danau Singkarak) Analysis Of Issues In Environmental Ethics (Singkarak Lake Reclamation). Prosiding Semnas Bio 2022, Hal. 438, ISSN: 2809-8447.

Pemerintah Indonesia. 2009. Peraturan Menteri Kehutanan Republik Indonesia Nomor: P. 60/Menhut-II/2009 Tentang Pedoman Penilaian Keberhasilan Reklamasi Hutan. Lembaran Negara RI Tahun 2009(317), Sekretariat Negara, Jakarta.

Pemerintah Indonesia. 2011. Peraturan Menteri Kehutanan Republik Indonesia No. P. 04/Menhut-II/2011 Tentang Pedoman Reklamasi Hutan. Lembaran Negara RI Tahun 2011(23), Sekretariat Negara, Jakarta.

Pemerintah Indonesia. 2018. Keputusan Menteri Energi dan Sumber Daya Mineral Republik Indonesia No. 1827 K/30/MEM/2018 Tentang Pedoman Pelaksanaan Kaidah Teknik Pertambangan Yang Baik. Lembaran Negara RI Tahun 2018(1827), Sekretariat Negara, Jakarta.

Pemerintah Indonesia. 2020. Undang-Undang No. 3 Tahun 2020 Tentang Perubahan Atas Undang-Undang Nomor 4 Tahun 2009 Tentang Pertambangan Mineral Dan Batubara. Lembaran Negara RI Tahun 2020(6252), Sekretariat Negara, Jakarta.

Prabowo, H., Azim, F., dan Yunasril. 2017. Perencanaan Reklamasi Dengan Revegetasi Pada Stockpile Di PT. Allied Indo Coal Kecamatan Talawi Kotamadya Sawahlunto Provinsi Sumatera Barat. Jurnal Bina Tambang, Vol. 4, No. 1, Hal. 93-94, ISSN: 2302-3333.

Sanjaya, M., R, 2018, Kajian Perencanaan Reklamasi Lahan Bekas Penambangan Nikel PT. ST Nickel Resources, Universitas Halu Oleo, Kendari, ISSN: 2549-9181.

Setyowati, N. D., Amala, A. N., dan Aini, U. N. N. 2017. Studi Pemilihan Tanaman Revegetasi Untuk Keberhasilan Reklamasi Lahan Bekas Tambang. Jurnal Teknik Lingkungan, Vol. 3, No. 1, Hal. 15, ISSN: 2460-8815.

Subowo, G. 2011. Penambangan Sistem Terbuka Ramah Lingkungan Dan Upaya Reklamasi Pasca Tambang Untuk Memperbaiki Kualitas Sumberdaya Lahan Dan Hayati Tanah. Jurnal Sumberdaya Lahan, Vol. 5, No. 2, Hal. 85-86, ISSN: 1907-0799.

Supit, D. D. 2020. Analisa Produktivitas dan Efisiensi Alat Berat Untuk Pekerjaan Tanah, dan Pekerjaan Perkerasan Berbutir (Studi Kasus: Proyek Rehabilitasi Ring Road II – Paniki). Dynamic Sain T, Vol. 5, No. 1, Hal. 908-909.

Suryaningtyas, D., Sulistijo, B., Iskandar, Sudaddi, U., Adriyanto, D., Kusumo, dan Srihartati, Y. 2019. Buku Pegangan untuk Praktik Terbaik dalam Reklamasi Tambang Darat Timah Aluvial di Indonesia Pembelajaran dari Proyek Percontohan Reklamasi Air Kundur 3, Provinsi Kepulauan Bangka Belitung. Jakarta. Bundesanstalt Fur Geowissenschaften und Roshtoffe. Hal. 5, 58 dan 59, ISBN: 978-3943566-66-6.

Yunasril, Kasim, T., dan Alkad, E. 2018. Perencanaan Dan Biaya Reklamasi Lahan Bekas Tambang Area Tambang Batubara PT. Baturona Adimulya Desa Supat Barat Kecamatan Babat Supat Kabupaten Musi Banyuasin. Jurnal Bina Tambang, Vol. 3, No. 3, Hal. 1268, ISSN: 2302-3333.

Zainal, I. R., Syafrizal, A., Sari, Y., Binur, W., dan Muhaimin, A. 2018. Pedoman Memahami Reklamasi Dan Pascatambang Serta Pasca operasi Di Sektor Minerba. Palembang. Unsri Press. Hal. 9, ISBN: 978-979-587-764-6.

Published

2024-11-19

Most read articles by the same author(s)

1 2 > >>