RECLAMATION PLANNING AT PIT C2 PT APOLLO NICKEL INDONESIA LASOLO DISTRICT, KEPULAUAN KONAWE UTARA REGENCY

Authors

  • Satriana Satriana
  • Muhardi Mustafa Halu Oleo University
  • Muhammad Ilham Kadar Halu Oleo University

Keywords:

PT. Apollo Nickel Indonesia, Reclamation, Productivity equipment

Abstract

the quality of the environment and ecosystem so that it can function again according to its intended purpose. In the mining activities of PT. Apollo Nickel Indonesia has completed the required activities, namely carrying out reclamation. In planning reclamation activities, technical reclamation tools are needed. Therefore, in this research, calculations were carried out to determine the number of technical equipment required for use in reclamation activities that will be carried out at pit C2. Based on the results of observations on mining activities carried out in pit C2, data was obtained in the form of productivity values ​​for digging and loading equipment, transportation equipment and eviction equipment. In this research, a quantitative analysis method was used by taking into account the value of the area, productivity and actual working hours to obtain the value of the need for digging and loading equipment, transportation equipment and eviction equipment needed for reclamation activities to achieve optimal values. Based on research conducted with an area of ​​1.75 Ha, the productivity of the Volvo PC-350 excavator equipment was 377,64 tons/hour, the HINO 500 FM 260 JD dump truck was 362,634 tons/hour and the D68ESS-12 bulldozer was 235,55 tons/hour. the number of Volvo PC-350 excavator digging and loading equipment is 1 unit, HINO 500 FM260T dump truck is 3 units and D68ESS-12 bulldozers are 2 units. The estimated time for the planned land planning activities is approximately 14 days using 1 shift working hours.

References

Achmad, A., Utamakno, L., Prasetyo, C. D., & Jondriawan. (2017). Perencanaan Reklamasi Yang Baik Untuk Terciptanya Lahan Bekas Tambang Yang Produktif. Seminar Nasional Inovasi Dan Aplikasi Teknologi Di Industri, Hal. 1-6, ISSN : 2085-4218.

Fisonga, M., & Mutambo, V. (2017). Optimization of the fleet per shovel productivity in surface mining: Case study of Chilanga Cement, Lusaka Zambia. Cogent Engineering, Hal. 2-16

Hustrulid, W., Kuchta, M., & Martin, R. (2013). Open Pit Mine Planning & Design 3rd Edition. ISBN : 0415407400

Komatsu. (2009). Specifications and Applications Handbook Edition 32. Japan

SaputroS, K. J., Wardhana, H. R., & Riyadi, F. A. 2023. Study of Reclamation Plans for PT ABC Coal Mining Areas in Laung Tuhup and Barito Tuhup Raya Districts, Murung Raya Regency, Central Kalimantan Province. Jurnal Teknologi Pertambangan, Vol. 8, No. 2,Hal. 181–185

. Zulkarnain, F. (2020). Pemindahan Tanah Mekanis dan Peralatan Konstruksi. Medan, Umsu Press. ISBN : 978-623-6888-18-6.

Published

2024-11-19

Most read articles by the same author(s)