ESTIMATION OF OVERBURDEN STRIPPING AND ORE GETTING COSTS AT PIT DTC 3 PT BUMI KONAWE MINERINA MOLAWE DISTRICT NORTH KONAWE UTARA
Keywords:
Loading and Transport Equipment, Overburden Stripping Cost Estimation and Ore gettingAbstract
PT Bumi Konawe Minerina is a nickel mining company operating in Molawe District, North Konawe Regency, Southeast Sulawesi Province. The company plans to develop a new pit, PIT DTC 3, spanning an area of approximately 2 hectares. The project involves a total overburden volume of 957,516.36 m³ 1,340,522.91 tons and an ore getting volume of 578,830.45 m³ 868,245.68 tons. This study focuses on optimizing the fleet composition of loading and hauling equipment, while estimating the total expenditure for these activities. For overburden stripping during the first six months, it includes 2 units are proposed for digging and loading overburden activities, 1 SUNWARD 365-E Excavator unit for unloading material in disposal, plus 5 SANY VNY430MSE-80 Dump Truck units for transportation and seventh month includes 1 CAT 345-GC Excavator unit, 1 SUNWARD 365-E Excavator unit, 2 SANY VNY430MSE-80 Dump Truck units. Meanwhile, for ore acquisition during the first four months, it includes 2 units of CAT 345-GC Excavator for digging and loading ore getting, 1 unit of SUNWARD 365-E Excavator unloading material in stockpile and 3 units of SANY VNY430MSE-80 Dump Truck for hauling and the fifth month includes 1 unit of CAT 345-GC Excavator, 1 unit of SUNWARD 365-E Excavator, 2 units of SANY VNY430MSE-80 Dump Truck. Thus, the total cost required for overburden stripping and ore getting activities at PIT DTC 3 reached Rp. 19.228,904,205,98 (Nineteen Billion Two Hundred Twenty Eight Million Nine Hundered Four Thousand Two Hundred Five Rupiah).
References
Asmiani, N., Puspitasari, A., dan Widodo, S. (2017). Biaya Penambangan Nikel Pada Pt . Bintang Delapan Mineral Kabupaten Morowali Provinsi Sulawesi Tengah. Jurnal Geomine. Vol 5, No 2, Hal. 76–79, ISSN: 2443-2083
Caterpillar. (2000). Caterpillar Performance Handbook Edition 31 (Issue October).
Chaufelberger, S., dan John E., Migliaccio, G.C. (2019). Construction Equipment Management. ISBN: 978-0-8153-6082-7
Epi, Handayani, R. H., dan HAK, A. (2017). Re Desain Pengaturan Peralatan Coal Getting Untuk Memenuhi Target Produksi Desember 2016. Jurnal Pertambangan, Vol.1, No.4. Hal.28–37. ISSN:2549-100M.
Febrianti, D., Zakia, Z., dan Mawardi, E. (2021). Analisis Biaya Operasional Alat Berat pada Pekerjaan Timbunan. Tameh: Journal of Civil Engineering, 10(1), 33–41. ISSN: 2089-6085
Franicha, F., Hidayat, S., dan Iskandar, T. (2017). Mining Equipment Analysis to Reach Target Production on Overburden in Kutai Kertanegara East Borneo. Febe Franicha. Int. Journal of Engineering Research and Application Www.Ijera.Com, 7(2), 36–44. ISSN:2248-9622
Gitosuwondo, S. (2011). Penambangan Sistem Terbuka Ramah Lingkungan dan Upaya Reklamasi Pasca Tambang untuk Memperbaiki Kualitas Sumberdaya Lahan dan Hayati Tanah. Jurnal Sumberdaya Lahan, 5(2), 83–94.
Herlita, P., dan Murad. 2018. Analisis Kebutuhan Alat Muat dan Alat Angkut Pada Kegiatan Penambangan Soil di Area 242 Dengan Penerapan Metode Antrian Untuk Memenuhi Target Produksi Clay 3000 Ton/hari. Jurnal Bina Tambang, Vol. 3 No.3. ISSN: 2302:3333.
Indonesianto, Y., M.S. (2013). Pemindahan Tanah Mekanis. CV.Awan Poetih.ISBN: 978-602-820607-5
Kholil, A. (2012). Alat berat: Alat berat. ISBN: 978-979692-080-8., 1–275.
Komatsu. (2019). Application Handbook Edition 32 . Section 15A. Printed in Japan
Lintjewas, L., Setiawan, I., dan Kausar, A. Al. (2019). Profil Endapan Nikel Laterit di Daerah Palangga, Provinsi Sulawesi Tenggara. RISET Geologi Dan Pertambangan, 29(1), 91. ISSN: 012-9849
Mohammadi, M., Rai, P., dan Gupta, S. (2015). Performance Measurement of Mining Equipment. International Journal of Emerging Technology and AdvancedEngineering,5(7), 240–248. ISSN: 2250-2459
Mulyani, S., Yunita, N.A., Satria, D.I., dan Indrayani., Y. M. (2017). Akuntansi Biaya. ISBN: 978-602-6960-53
Mukiat, dan Asof, M. (2023). Analisis Investasi Tambang (Pendekatan Logis Dalam Usaha Pertambangan). PT. Awfa Smart Media.
Nourali, H., dan Osanloo, M. (2020). A regression-tree-based model for mining capital cost estimation. International Journal of Mining, Reclamation and Environment, 34(2), 88–100. ISSN: 1748-0930
Oemiati, N., Revisdah, R., dan Rahmawati, R. (2020). Analisa Produktivitas Alat Gali Muat Dan Alat Angkut Pada Pengupasan Lapisan Tanah Penutup (Overburden). Bearing : Jurnal Penelitian dan Kajian Teknik Sipil, 6(3), 194–207.
Pemerintah Republik Indonesia. (2020). Undang-undang (UU) Nomor 3 Tahun 2020 tentang Perubahan atas Undang-Undang Nomor 4 Tahun 2009 tentang Pertambangan Mineral dan Batubara.
Rostiyanti. (2008). Alat Berat Untuk Proyek Konstruksi. ISBN 978-979-518-850-6
Rumengan, M., Dundu, R. A. K. T., dan Pratasis, P. A. K. (2017). Analisa Kelayakan Investasi Alat Berat Stone Crusher Dikelurahan Kumersot Kota Bitung. Jurnal Sipil Statik, 5(10), 679–688. ISSN: 2337-6732
Rizal, R., Anshari, E, Nafiu, W,R,A., dan Saputra, I. (2023). Perencanaan Biaya Pengupasan Overburden Dan Ore Getting Pada Blok Ulusawa 3 Di PT. Gerbang Multi Sejahtera. Jurnal Riset Teknologi Pertambangan (J-Ristam), Volume 3, No. 01, Hal. 17, ISSN: 2621-3869
Sepriadi, dan Webisono, K. (2017). Evaluasi Geometri Jalan Angkut Terhadap Produktifitas Overburden Di Pit Mt 4 Penambangan Air Laya PT Bukit Asam (Persero), Tbk. Tanjung Enim Provinsi Sumatera Selatan. Jurnal Teknik Patra Akademik, Vol.8, No.2, Hal.1–9. ISSN: 2621-9328.
Saputra, F. 2018. Kajian Produktivitas Alat Muat dan Alat Angkut pada Pengupasan Overburden di Pit S5 Selatan. Indonesian Artikel Journal. Volume 1, No. 1. 29 – 39.
Surono, dan Hartono. (2013). Geologi Sulawesi. In Badan Geologi, Kementrian Energi dan Sumber Daya Mineral.
Suryawan, A. (2019). Manajemen Alat Berat. Yogyakarta: Penerbit Deepublish. E ISBN: 978-623-02-0245-2.
Subowo G. (2011). Penambangan Sistem Terbuka Ramah Lingkungan Dan Upaya Reklamasi Pasca Tambang Untuk Memperbaiki Kualitas Sumberdaya Lahan Dan Hayati Tanah. Jurnal Sumberdaya Lahan, Vol.5, No.2. Hal. 83–94. ISSN: 1907-0799.
Syaharuddin, Firdaus, dan Anshari, E. (2024). Estimasi Biaya Produksi Alat Gali Muat dan Alat Angkut pada Penambangan Nikel di Blok B1 Pit 5 PT. Anugrah Harisma Barakah Kecamatan Kabaena Selatan. 5(1), 14–22. ISSN:2774-2644
Tenriajeng, A. T. (2003). Pemindahan Tanah Mekanis. Gunadarma.
Downloads
Published
Issue
Section
License
Copyright (c) 2026 Yuda Wijaya; Deniyatno, Marwan Zam Mili

This work is licensed under a Creative Commons Attribution 4.0 International License.