Design of the mining sequence for nickel ore at the Kokoe pit of PT Arga Morini Indah in Talaga Raya District, Buton Tengah Regency, Southeast Sulawesi Province.

Authors

  • Aris Lawajo
  • Deniyatno Deniyatno Halu Oleo University
  • Wira Yudha Halu Oleo University
  • Irfan Ido Halu Oleo University

Keywords:

nickel laterite, minel life, Mine Sequence

Abstract

PT. Arga Morini Indah is one of the companies specializing in the nickel mining industry with a mining business license (IUP) covering approximately ±2,833 hectares. The mining site is located in Talaga Raya Sub-district, Buton Tengah Regency, Southeast Sulawesi Province. To maintain production levels, PT. Arga Morini Indah is currently planning to open a new mining pit, Kokoe Pit, with an area of approximately 8.47 hectares and a production target of 100,000 tons per month. However, the reserve quantity, mine life, and mining sequence design for Kokoe Pit are yet to be determined. Therefore, this study aims to design a mining sequence based on production targets. The Kokoe Pit design is based on the estimated ore distribution. The estimated ore reserves that can be mined, based on the pit limit design at Pit Kokoe, comply with the company's cut-off grade (COG) standards while considering a mining recovery rate of 90%, estimated to reach 252,175.79 m³ and a tonnage of 365,654.90 tons with an average nickel grade of 1.72%. Therefore, the estimated mine life at the Kokoe Pit of PT. Arga Morini Indah is approximately 3.65 months. Based on the production target for the Kokoe Pit, the mining sequence design is divided into four phases and consists of three pits or openings.

References

A. Maulana, “Endapan Mineral,” 2020, Yogyakarta. ISBN: 978-602-258-428-5.

Efendi, R. and D. Yulhendra, 2020, “Quarterly Plan Penambangan Nikel Tahun pada Pit X PT . Elit Kharisma Utama Menggunakan Software Maptec Vulcan 9.1 vol. 4, no. 1, jurnal bina tambang vol. 4 , no. 1, ISSN: 2302-3333.

Rafsanjani, M. R., Djamaluddin, dan Bakri, H., 2016, “Estimasi sumberdaya bijih nikel laterit dengan menggunakan metode idw di provinsi sulawesi tenggara,” vol. 04, no. 1, ISSN: 2541-2116.

Sujiman, 2015, Kajian Perhitungan Cadangan Batubara Menggunakan Metode Block model 2 Dimensi dan Cross Section di Software Surpac Pada PT. Tanito Harum Kalimantan Timur, Prosiding Teknik Pertambangan, Jurnal Geologi Pertambangan, vol. 1 No. 1, ISSN:1978-067.

Bargawa, W. S., 2018. Perencanaan Tambang, Edisi ke delapan. Kilau Book. Yogyakarta. Hal. 52-53

H. Pranata, D. Yulhendra, 2021, Rancangan Pelaksanaan Eksploitasi Nikel Pada Blok X PT Paramitha Persada Tama Desa Boenaga Kecamatan Lasolo Kepulauan Kabupaten Konawe Utara Provinsi Sulawesi Tenggara, Jurnal Bina Tambang, Vol. 6, No. 5, ISSN: 2302-3333.

B. a. Kennedy 2009, Surface mining 2nd Edition. Colorado. Amerika Serikat. ISSBN-13: 978-1-4822-2117-6.

I. ndrajaya Fahrul, 2019., Perancangan Sequence Penambangan Batubara Pada PT XYZ Provinsi Sumatera Selatan, Jurnal Geomine, Vol. 7, No. 3, ISSN: 2443-2083.

Published

2025-06-18

Most read articles by the same author(s)

<< < 1 2