PIT DESIGN AND MINING SEQUENCE OF NICKEL ORE ON PIT B BLOK MANGROVE PT. INDRABAKTI MUSTIKA SITE LAMERURU

Authors

  • NUR ARIF WIBAWA UNIVERSITAS HALU OLEO
  • Erwin Anshari Halu Oleo University
  • Irfan Saputra Halu Oleo University
  • Ika Sartika Ambarsari Halu Oleo University

Keywords:

Nickel, Mine Resource, Mine Reserve, Netpromine

Abstract

PT. Indrabakti Mustika is one of the companies that took the opportunity to carry
out a nickel ore mining business with a Mining Business Permit (IUP) area of
576.00 Ha. Currently PT. Indrabakti Mustika plans to open a mining area in the
Mangrove Block Pit B, which is in the Mangrove Block Pit B with an estimated area
of ± 20 Ha. This study aims to design a pit based on ore deposits, calculate the
amount of reserves based on the pit limit design and design a mining sequence
based on production targets in Pit B of the Mangrove Block. The amount of reserves
obtained is based on the pit limit design with a cut off grade by the company of
1.25% Ni, the total reserves are 1,421,931.25 tons with a mining recovery of 90%,
the total mineable reserves are 1,279,738.13 tons. The average Ni content is 1.55%
and the resulting stripping ratio is 2.08:1, so that the mine life of the Mangrove
Block Pit B is estimated at 7 months. Based on the production target, the sequence
is designed with 7 stages of mining (mining sequence) where the average grade
value of the first sequence and the seventh sequence is 1.6%.

References

Arif, I. (2016). Geoteknik Tambang (Mewujudkan Produksi Tambang Yang Berkelanjutan dengan Menjaga Kestabilan Lereng). PT Gramedia Pustaka Utama. ISBN: 978-602-03-2735-8.

Bai, X., Marcotte, D., Gamache, M., Gregory, D., dan Lapworth, A., 2018, Automatic generation of feasible mining pushbacks for open pit strategic planning, The Journal of The Southern African Institute of Mining and Metallurgy, Vol. 118, Hal. 515-530. ISSN: 2225-6253.

Bargawa, W. S. (2018). Geostatistik (Edisi Ketiga). Kilau Book. ISBN: 978-623-7594-42-0.

Bargawa, W. S. (2018). Perencanaan Tambang (Edisi Kedelapan). Kilau Book. ISBN: 978-623-7594-31-4.

Darling, P. (2011). Mining Engineering Handbook Third Edition. Society For Mining, Metallurgy, And Exploration, INC. ISBN 978-0-87335-264-2.

Hardiyatmo, H.S. (2018). Mekanika Tanah II. Gadjah Mada University Press. ISBN: 979-420-637-7.

Hidayanti, T., Handayani, I., dan Ikasari, I. H. (2013). Statistika Dasar Panduan Bagi Dosen dan Mahasiswa. CV.Pena Persada. ISBN: 978-623-7699-69-9.

Hustrulid, W., Kuchta, M., dan Martin, R. (2013). Open Pit Mine Planning & Design 3rd Edition. CRC Press Taylor & Francis Group. London. ISBN: 978-1-4822-2117-6.

Komite Cadangan Mineral Indonesia. (2017). Kode Pelaporan Hasil Eksplorasi Sumberdaya Mineral dan Cadangan Bijih Indonesia. Perhimpunan Ahli Pertambangan Indonesia dan Ikatan Ahli Geologi Indonesia 2.

Keputusan Menteri Republik Indonesia. (2018). Keputusan Menteri Sumber Daya Energi danMineral Republik Indonesia Nomor 1827 K/30/MEM. Menteri Energi Sumberdaya Mineral Republik Indonesia.

Khaq, M. N., Bargawa, W. S., dan Winarno, E. (2022). Estimasi Sumberdaya Endapan Nikel Laterit Sulawesi Tenggara dengan Metode Ordinary Kriging. Jurnal Sumberdaya Bumi Berkelanjutan (SEMITAN), Vol. 1, No. 1, Hal. 1-6. ISSN: 2962-682X.

Kurniadi, A., Rosana, M. F., Yuningsih E. T., dan Luhur, P. H. (2018). Karakteristik Batuan Asal Pembentukan Endapan Nikel Laterit Di Daerah Madang dan Serakaman Tengah. Padjadjaran Geoscience Journal, Vol. 2, No. 3, Hal. 221-234. ISSN: 2597-4033.

Loilatu, R., dan Iswanduru. (2022). Analisis Kestabilan Lereng Andesit Menggunakan Metode FEM Pada PT. X. Jurnal Riset Teknik Pertambangan (JRTP), Vol. 2, No. 1, Hal. 15-24. ISSN: 2798-6357.

Lintjewas, L., Setiawan, I., dan Kausar, A. Al. (2019). Profil Endapan Nikel Laterit di Daerah Palangga, Provinsi Sulawesi Tenggara. RISET Geologi Dan Pertambangan, Vol. 29, No. 1, Hal. 91-104. ISSN: 0125-9849.

Malli, T., Pamukcu, C., dan Kose, H., 2015, Determination Of Optimun Production Capacity And Mine Life Considering Next Present Value In Open Pit Mining At Different Overall Slope Angles, Acta Montanistica Slovaca, Vol. 20, No. 1, Hal. 62-70. ISSN: 1339-3103.

Mandew, P., Putra, H. J., Habrianto, R., dan Hardianto, Z. (2021). Perancangan Sequence Penambangan Batubara Di Pit Tutupan Selatan Area Mitsubishi PT. Pama Persada Nusantara Jobsite PT. Adaro Indonesia, Kalimantan Selatan. Jurnal Indonesia Teknologi, Vol. 2, No. 3, Hal. 427-442. ISSN: 2723 - 6609.

Revuelta, M.B. (2018). Mineral Resources From Exploration to Sustainable Assessment. Springer Nature. Switzerland. ISBN: 978-3-319-58760-8.

Saleki, M., Kakaie, R., dan Ataei, M., 2019, Mathematical Relationship Between Ultimate Pit Limits Generated By Discounted And Undiscounted Block Value Maximization in Open Pit Mining, Journal of Sustainable Mining, Vol. 18, No. 2, Hal. 94-99. ISSN: 2300-3960.

Untari, D., T. (2020). Buku Ajar Statistik 1. CV. Pena Persada. ISBN: 978-623-6504-57-4.

Wibisono, R. A., Yuliadi, dan Maryanto. (2017). Perancangan Pentahapan Kemajuan Tambang Batubara dan Perencanaan Fleet di PT Bukit Intan Indoperkasa , Desa Batang Kulur Kiri , Kecamatan Sungai Raya , Kabupaten Hulu Sungai Selatan, Provinsi Kalimantan Selatan. Prosiding Teknik Pertambangan, Hal. 352-361. ISSN: 2460-6499.

Wintolo, D. (2019). Pengantar Statistik Dan Geostatistik. Gadjah Mada University Press Anggota IKAPI dan APPTI. ISBN: 978-602-386-310-5.

Published

2024-06-06 — Updated on 2024-08-19

Versions